Concrete Finishers
Genuine Builders, Inc.
Compensación
$25.23/hora
- Salario mensual estimado:
- $4,373.20
- Estimado total del contrato completo:
- $3,171.77
- Salario de tiempo extra:
- $37.85/hora
- Deducciones de salario:
- All deductions from the worker’s paycheck will be made as required by law. Any advances will be deducted with the consent of the employee. The employer will provide housing as an option to employees living outside the regular commuting distance. Employees who elect to live in the housing will have an additional $250.00 deducted per biweekly paycheck for rent and utilities.
Los estimados se calculan a partir de la tarifa de salario, las horas semanales y las fechas de contrato del registro oficial. No son una garantía de ingreso real.
Detalle del trabajo
- Fechas:
- 9 de diciembre de 2026 – 31 de diciembre de 2026
- puestos:
- 22
- Horas semanales:
- 40
- Vivienda:
- Se proporciona
- Transporte:
- Se proporciona
Descripción del trabajo
Your attention is requested to the following letter in support of Genuine Builders, Inc.s (GBI) request for twenty-two (22) temporary Concrete Finishers to supply our seasonal temporary need in Rochester, Indiana. GBI of Arlington, South Dakota is a concrete sub-contractor that has provided specialized concrete construction services for the last twenty-eight (28) years. The Concrete Finishers will: Prepare construction site where concrete will be poured by directing concrete laborers to place materials on job site, measure forms, examine the grade and confirm proper form layout. Safely set and align wooden and metal forms that hold concrete. Spread, level and smooth concrete using rakes, walk-behind or riding screeds, power trowels, shovels or hand tools. Tear down concrete forms and cut concrete with concrete saws. Clean up construction site. The Concrete Finishers must have 36 months of concrete finisher experience and be able to handle temperature extremes and lift and carry 75 lbs. for 50 yards. They will work some weekends and travel to worksites within area of intended employment. For more information regarding the company and photographs of some of its projects, see Exhibit A. Schedule of Operations Each year, GBIs schedule of operations is as follows: GBIs annual schedule of operations begins in April and ends in December. GBI will begin working on projects in Rochester, Indiana in November and seeks to have H-2B workers on site as soon as possible. Work will continue through December 31st. In January, the weather is too cold to perform concrete work. Therefore, the company does not perform concrete work from January through March. Work that is performed at the end of a project includes cleaning up, which can take up to a month depending on the size of the project. Clean up includes the following duties to get rid of waste materials and prepare the site for the client: o Grind metal inserts in the concrete so that the top is level and completely flat. o Caulk around concrete. o Patch air pockets in concrete. o Clean up excess concrete which has seeped out from around the forms. o General clean-up including, disposal of excess concrete dumped by pump trucks at the site. o Dispose of used or damaged lumber, pick up debris and load excess supplies. o Clean and oil forms, then load them onto the trailer. o Forms must be stacked so they are not overweight on the trailer. Temporary Seasonal Need GBI has a seasonal need that is traditionally tied to a season of the year by an event which is of a recurring nature, specifically the weather that permits concrete construction. In the late spring and early summer, the company experiences an increased demand for its work as the weather warms to allow cement construction. During the winter months, from January through March, the weather is too cold for proper setting of concrete. Excavation of concrete footings is more difficult, if not impossible. Cold Weather Concreting Reported by ACI Committee 306, Section 1.1, Definition of cold weather, defines cold weather as a period when, for more than 3 consecutive days, the following conditions exist: 1) The average daily air temperature is less than 40F; and 2) The air temperature is not greater than 50F for more than one-half of any 22-hr period. The average daily air temperature is the average of the highest and lowest temperatures occurring during the period from midnight to midnight. Cold weather, as defined in this report, usually starts during fall and usually continues until spring. Exhibit B. The cold season in Rochester, Indiana lasts for over three (3) months, with an average daily high temperature of 32 F in January and 31 inches of average annual snowfall. See Exhibit C, Average Weather in Rochester, Indiana, United States. Please see attached.
Ubicación
7901 South 100 West, Rochester, IN 46975
Este registro confirma que la oportunidad aparece en la fuente oficial de datos del Departamento de Trabajo citada, en el momento indicado. No prueba disponibilidad actual, no garantiza selección, ni autoriza a un reclutador a cobrarte dinero. No pagues cuotas de reclutamiento no autorizadas.
Ver la fuente oficial del Departamento de Trabajo de EE. UU.
Última actualización: 7 de octubre de 2026